Site has been excavated and foundation is poured. Floor box framing starts today:
Site has been excavated and foundation is poured. Floor box framing starts today:
Site has been excavated and footings are in. A few shots of forms going up for the foundation walls:
Foundation in and water-proofed:
Delivering foundation forms to the site:
Foundation walls poured and waterproofed:
Laying out the foundation on the excavated site:
Crawl space forms in place: Framing started for the pole building:
Main basement poured and waterproofed. On to drain tile installation and backfilling for crawl spaces:
Foundation walls are in and Lower Level floor slab poured: