GRANTZ
Foundation in and water-proofed:
![JASPER](http://gibsonhomesinc.com/wp-content/uploads/2016/06/DSCN5167-824x1024.jpg)
JASPER
![KALMBACH](http://gibsonhomesinc.com/wp-content/uploads/2015/10/DSCN3239-724x1024.jpg)
KALMBACH
![PAXTON](http://gibsonhomesinc.com/wp-content/uploads/2015/10/DSCN3254-1024x661.jpg)
PAXTON
Main basement poured and waterproofed. On to drain tile installation and backfilling for crawl spaces:
![SCHNEIDER](http://gibsonhomesinc.com/wp-content/uploads/2015/09/20150924_084018-1024x576.jpg)
SCHNEIDER
Foundation walls are in and Lower Level floor slab poured:
![ROBERTS](http://gibsonhomesinc.com/wp-content/uploads/2015/06/IMAG1908-1024x577.jpg)
ROBERTS
Parking pad and sidewalk poured:
![KALMBACH](http://gibsonhomesinc.com/wp-content/uploads/2014/11/DSCN1984-1024x768.jpg)
KALMBACH
Concrete forms are on site at the Kalmbach Residence:
![MANOR](http://gibsonhomesinc.com/wp-content/uploads/2014/11/IMAG1401-1024x577.jpg)
MANOR
![MANOR](http://gibsonhomesinc.com/wp-content/uploads/2014/09/DSCN1527-1024x768.jpg)