![SMITH](http://gibsonhomesinc.com/wp-content/uploads/2016/10/DSCN5661-1024x703.jpg)
SMITH
Site has been excavated and footings are in. A few shots of forms going up for the foundation walls:
Site has been excavated and footings are in. A few shots of forms going up for the foundation walls:
Crawl space forms in place: Framing started for the pole building:
Concrete formwork is up. Views from around the site:
Lot excavated for foundation. Setting forms for footings and preparing to pour: