PAXTON
Crawl space forms in place: Framing started for the pole building:
JASPER
Site cleared and excavation set to start this afternoon:
O-Reilly-Pepin Design Binder
KALMBACH
PAXTON
Main basement poured and waterproofed. On to drain tile installation and backfilling for crawl spaces:
SCHNEIDER
Foundation walls are in and Lower Level floor slab poured:
SCHNEIDER
PAXTON
Clearing the site: