![](http://gibsonhomesinc.com/wp-content/uploads/2017/06/DSCN6081-300x130.jpg)
Current view of the front of the house.
![](http://gibsonhomesinc.com/wp-content/uploads/2017/06/DSCN6082-300x212.jpg)
All exterior concrete completed.
![](http://gibsonhomesinc.com/wp-content/uploads/2017/06/DSCN6067-300x198.jpg)
Lower Patio as seen from a Main Level window.
![](http://gibsonhomesinc.com/wp-content/uploads/2017/06/DSCN6070-201x300.jpg)
Main stairway in the Foyer.
![](http://gibsonhomesinc.com/wp-content/uploads/2017/06/DSCN6062-300x207.jpg)
Kitchen is coming along. Open shelving, appliances, and beam stain to come.
![](http://gibsonhomesinc.com/wp-content/uploads/2017/06/DSCN6064-248x300.jpg)
Master closet getting a final spray on the shelving before a final coat of color.