SMITH – cont’d
Master Suite 2 – window seat cabinets installed. Upper Level Laundry area. Installing Upper Level cabinets.
SIEGERT
SIEGERT – cont’d
Hole in the existing foundation to access new crawlspace. Steel in place, straightening the wall. Framing the main level addition.
SMITH
SMITH – cont’d
SIEGERT
Beginning excavation this morning, 4-12-10:
SMITH
SMITH – cont’d
Archways between the Living and Music Rooms framed. Master Suite 2 bathtub installed. Upper Level Kitchen island framed.