FOTOF, LLC
Building walk-thru, making a demo plan for the Upper Level south apartment:
Building walk-thru, making a demo plan for the Upper Level south apartment:
Main Level floor box installed and sheeted, 3-8-11:
Framing Lower Level walls 3-3-11:
Framing begins – installing sill plates:
Approaching the site. Surveying the excavation. Spreading sand.
Looking much better with fresh drywall:
Breaking ground on Valentines Day:
Living/Dining area. Living/Dining area. New closet in East Bedroom. The Kitchen as tool storage and workroom.
New crown molding in the Kitchen. Entertainment center in the Living Room. Straight-on view of the new entertainment center.