HOTOVY
Starting excavation 10-26. Starting with tree removal. Property is staked and ready to dig!
Starting excavation 10-26. Starting with tree removal. Property is staked and ready to dig!
New outdoor patio. Renovated fireplace on Main Level. Lower Level Bar. Standing at Lower Level Bar looking into Rec. Room.
The Living Area. A Lower Level Bedroom. Lower Level Bathroom.
Preparing for excavation:
Breaking ground:
Family room looking back at the bar-paint done Bathroom paint complete