HOTOVY – cont’d
Standing on the Deck. Main Level Bathroom tub/shower installed. Furnace and ductwork in the Lower Level. Stair framing.
HOTOVY
KOTHS
Drywalling:
HOTOVY
Current view from the road. Sheeting the roof. Building sub-fascia. Master Bedroom window framing.
HOTOVY – cont’d
KOTHS
From the road. Siding complete on Lake side. Utility Room. Furnace installed.
HOTOVY
Exterior walls framed and, sheeting started, and laying out interior walls:
BIGGS
Lower Level fireplace install complete. Closer view of the fireplace and stonework.