gibsonhomes

POLLOCK

POLLOCK

Exterior wall framing started.  View from driveway. Lake side of the house. View from the future Kitchen.

READ MORE

GOULD

GOULD

Preparing to pour foundation walls:

READ MORE

POLLOCK

POLLOCK

Installing the floor box: Setting the I-joists. A view from above.  LVL beams and steel posts in place. From the Lake side.

READ MORE

VANDERVEN

VANDERVEN

Drywall throughout the condo: Kitchen. Main Entry. Main Level Living Area. Upper Level fireplace.

READ MORE

POLLOCK

POLLOCK

Garage foundation walls poured. Front Porch walls poured.

READ MORE

POLLOCK - cont'd

POLLOCK – cont’d

Unloading foundation forms from the truck. Footings poured. Getting ready to set forms for the foundation walls.

READ MORE

VANDERVEN

VANDERVEN

Pumping blown-in cellulose insulation 4 stories up from a truck in the alley below. Blowing the cellulose insulation into the… read more