GOULD
Pouring the basement slab:
Pouring the basement slab:
Exterior wall framing started. View from driveway. Lake side of the house. View from the future Kitchen.
Preparing to pour foundation walls:
Installing the floor box: Setting the I-joists. A view from above. LVL beams and steel posts in place. From the Lake side.
Drywall throughout the condo: Kitchen. Main Entry. Main Level Living Area. Upper Level fireplace.
Garage foundation walls poured. Front Porch walls poured.
Excavation for the house:
Excavation started last week:
Unloading foundation forms from the truck. Footings poured. Getting ready to set forms for the foundation walls.