![Main Entry nearly complete, just needs concrete steps.](http://gibsonhomesinc.com/wp-content/uploads/2015/06/DSCN2539-251x300.jpg)
Main Entry nearly complete, just needs concrete steps.
![Landscape work continues on the Lake side of the house. Finishing up the retaining wall and starting the pavers steps to the water and fire pit.](http://gibsonhomesinc.com/wp-content/uploads/2015/06/DSCN2574-300x224.jpg)
Landscape work continues on the Lake side of the house. Finishing up the retaining wall and starting the pavers steps to the water and fire pit.
![Kitchen nearly complete. Appliances to be installed next.](http://gibsonhomesinc.com/wp-content/uploads/2015/06/DSCN2541-300x213.jpg)
Kitchen nearly complete. Appliances to be installed next.
![Looking toward the Main Entry from the Kitchen.](http://gibsonhomesinc.com/wp-content/uploads/2015/06/DSCN2546-261x300.jpg)
Looking toward the Main Entry from the Kitchen.
![Master Bath cabinets and tops installed. Mirrors and light fixtures to come this week.](http://gibsonhomesinc.com/wp-content/uploads/2015/06/DSCN2550-206x300.jpg)
Master Bath cabinets and tops installed. Mirrors and light fixtures to come this week.
![Shower tile complete in a Guest Bathroom.](http://gibsonhomesinc.com/wp-content/uploads/2015/06/DSCN2557-230x300.jpg)
Shower tile complete in a Guest Bathroom.
![The Rec. Room is decked out with a coffered ceiling, wainscoting, dark cherry cabinets, and granite tops. Appliances and electronics are next.](http://gibsonhomesinc.com/wp-content/uploads/2015/06/DSCN2552-300x214.jpg)
The Rec. Room is decked out with a coffered ceiling, wainscoting, dark cherry cabinets, and granite tops. Appliances and electronics are next.