DOTSON
Morning of 3-28-11:
Morning of 3-28-11:
Rough grading:
Setting forms for the Garage and crawl space walls:
Main Level floor box installed and sheeted, 3-8-11:
Framing Lower Level walls 3-3-11:
Framing begins – installing sill plates:
Approaching the site. Surveying the excavation. Spreading sand.
Looking much better with fresh drywall:
Breaking ground on Valentines Day: