BONGA – cont’d Published on March 25, 2009 | Leave a response Cabinets waiting to be installed in the Lower Level. Greg installing the bar area cabinets on the Lower Level. Masons setting stone on the Lower Level interior columns.
Comments are closed, but trackbacks and pingbacks are open.