HOTOVY
HOTOVY
HOTOVY – cont’d
Standing on the Deck. Main Level Bathroom tub/shower installed. Furnace and ductwork in the Lower Level. Stair framing.
HOTOVY
HOTOVY
Current view from the road. Sheeting the roof. Building sub-fascia. Master Bedroom window framing.
HOTOVY – cont’d
HOTOVY
Exterior walls framed and, sheeting started, and laying out interior walls:
HOTOVY
From the road. Garage footings and foundation walls. Floor box built. View from the back yard. Egress window openings.
HOTOVY
Forms set for poured concrete basement walls: