HOTOVY
HOTOVY – cont’d
KOTHS
Concrete pad poured for Lower Level Garage. Laundry Room countertops. Hallway shelving. Master Bathroom vanity and top set.
VANDERVEN
HOTOVY
Color and trim in the Kitchen/Dining Room. One of the Guest Bedrooms. Master Suite painted and trimmed.
HOTOVY – cont’d
Building railing sections for the Deck.Railing sections are fabricated using only the fanciest of jigs.Peaceful view from the Deck.
KOTHS
Road side of house, stone installed on Lower Level Garage. Road side again, stone installed. Lake side of the house.
KOTHS – cont’d
Flooring being installed in Great Room, looking south.Another shot of Great Room flooring, looking north. Kitchen cabinets installed.
HOTOVY
Starting to drill the well.Finishing up insulation – blowing in ceilings. Looking at the Kitchen from the Dining Room.